Fees and Fines

Make checks payable to City of Henderson. Please mail checks to the City of Henderson Engineering Department at P.O. Box 1434 Henderson, NC 27536 or hand deliver to the Engineering Department at 900 South Beckford Drive, Henderson, NC.

General Fees:

Stormwater Fees and Fines:

Grading in a floodplain: $5,000

Call Army Corp of Engineers/DWQ

Filling in a Wetland, Creek or water course: $5,000

Erosion Control Fees


Plan Review Fee

0.50 acre to 0.999 acre = $75.00 

1 to 3 acres = $100.00 

More than 3 acres = $125.00 + 20.00 per acre


Permit Inspection Fee 

0.50 acre to 0.999 acre = $125.00

1 to 3 acres = $225.00

More than 3 acres = $325.00 + 20.00 per acre

Erosion Control Fines

Erosion Problems (failure to take all reasonable measures)

Sediment Offsite

Failure to Provide Adequate Ground Cover

Insufficient Measures to Retain Sediment Onsite

Failure to take all reasonable measures (see also insufficient measures) - $500

Large storm (non-hurricane) - $500

At start of project prior to full installation - $500

In between phased grading - $750 Â